system provider
theater und tournee produktions GmbH
Esslinggasse 7/3
A-1010 Vienna, Austria

 
 
 
 

Allianz Arena opening ceremony

 

IMAGES
INFO
LINKS
DEMO
VIDEO

 
 
 

April 2005

FC Bayern Muenchen and the football club TSV 1860 put system provider in charge of the technical preparation and realisation of the opening pageant of the Allianz Arena in Munich. Simultaneously we worked on solutions to bring a stage for the pregameshow, the halftimeshow and the aftergameshow on the holy green. The challenge was to bring a low weight, solid, mobile, and adaptable construct as fast as possible over a very sensitive surface in the shortest time possible. See Rolling Stage System for more information.

The opening ceremonies lasted two days, the first evening was stamped by TSV 1860, also called "Die Loewen / The Lions" who invited their football team, the FC Nuernberg as well as Status Quo and Spider Murphy Gang. In the Allianz Arena the first goal ever was shot by The Lions in the 9th minute.

The following day, FC Bayern Muenchen dedicated their opening evening of course to their football team. With the help of Thomas Gottschalk, Sarah Connor and Seal in combination with the footballgame FC Bayern Muenchen versus the German national league an amazing entertainment package was created.

SYSTEM PROVIDER COMPETENCE
entire technical planning and supervising, stagedesign, stage developement, sound equipment, lighting equipment, technical staff, production